Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 477 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission and permission for retention for development at this c.0.011 ha site in the carpark of Tesco. The development will consist of/consists of: (i) retention permission for ‘’click and collect’’ signage in the existing Tesco car park; and (ii) permission for the construction of a sheltered canopy (c.50 sq.m) in the existing car park for the purpose of providing 2 no. dedicated ‘’click and collect’’ spaces for the existing Tesco store, a pedestrian crossing and all associated site development works.
Retention permission for signage ancillary to the existing drive thru facility on a 0.0026 Ha (c.26 sq m) site. Retention permission for the existing overhead barrier (5.35m in height and 7.5m wide) located at the entrance to the carpark and drive thru facility accessed off Canon Field.
The development will consist of the change of use of No. 144B (77.5 sq m) from an existing retail unit to restaurant and the amalgamation of Nos. 144A and 144B to provide an enlarged McDonald’s restaurant (495.5 sq m), the 2 no. units were previously subdivided in the 1990’s and as such, the proposed development will restore the ground floor of the building to its original layout of 1 no. commercial unit. The proposed development also includes associated amendments to the facade of the proposed enlarged restaurant unit with associated signage and digital window poster; amendments to the existing drive thru arrangement principally comprising the replacement of the single drive thru lane with with a 2 no. lane drive thru arrangement with associated signage and menu boards; the relocation of the 4 no. existing accessible car parking spaces to facilitate to the new drive thru arrangement; and 1 no. new car parking space adjacent to the western boundary of the subject site.
Retention of two storey rear extension and two rear roof lights.
Permission for the demolition of existing commercial units and 1 no. residential unit, part of a block wall and stone wall and the construction of 9 no. residential units in total consisting of 7 no. town houses, 2 no. apartments, hard landscaping, planters, communal storage area and associated site works. The proposed development is within the Mallow ACA.
Permission to install a new external ATM with associated signage, and proposed new surround panel to the front elevation of the bank building with all associated site works (NIAH protected structure reference number 20815111)
The brief summarizes the pattern across all 477 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21/6703The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief