Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 312 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of dwelling house, domestic garage, new entrance and wastewater treatment system together with all other ancillary site works.
Permission for retention of as built extension to existing cottage and retention for replacement window in lieu of door on southern elevation together with all other ancillary site works.
A new residential development. Works to include: (1) to construct new 7 no. detached dwellings, (2) to construct new site entrance and access road to serve development, (3) installation of on site foul sewer pumping station, (4) all associated site services and site works.
Permission for the following – (1) new enclosed all-weather pitch, re-aligned to replace existing grass pitches, (2) provision of academy grass pitch in re-aligned pitch area (3) erection of 4no. 15m high flood lighting masts to serve all-weather pitch, (4) fencing/netting to surround of new all-weather pitch, (5) provision of concrete footpath around re-aligned pitches and all associated works within the confines of existing complex.
To erect 743.00 m2 or 150.30 kW of photovoltaic panels on the roof of existing Lidi Store with all associates site works.
Permission for the proposed construction of a residential development of 62 no. dwelling houses and all ancillary works. The proposed development consists of 4 no. detached housing units, 34 no. semi-detached housing units, and 24 no. terraced housing units. Ancillary site works include the provision of all associated site landscaping, public open spaces, a new public footpath (connecting to Masseytown Road via Cornmills) and servicing proposals. Vehicular access to the proposed development will be provided by a new entrance from the Mill Road.
The brief summarizes the pattern across all 312 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21/7411The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief