Applications tied to the site
Partial coverage22 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
22 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 168 decisions within 5 km, 22 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
22 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
22 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Installation of a diver training tank
(1) Demolish existing workshop building, (2) Construct new workshop building with staff facilities, site boundary fence and vehicular entrances, (3) Install solar PV Panels on roof of proposed workshop building, (4) Construct internal access roadway and footpaths, (5) Construction of new waste storage shed, inclusive of all ancillary site works
The installation of LED street lighting; to include 36 lighting columns, 8m high with LED lamps
Planning permission for marine sourced feed & nutritional material processing and storage facility
A new fuel tank compound (to replace existing fuel tank area on Dinish Island and Castletownbere mainland quay) to accommodate 6 no. bunded oil tanks (130,000 litre capacity each), 2 no. supply lines to connect fuel tanks to permitted new quay and onwards to existing quay, ancillary surface water drainage system, and ancillary site development works including areas of hardstand, public lighting and boundary fencing. All on a site of 0.42 ha approx.
The proposed development is situated on the Northern side of Dinish Island within the Castletownbere FHC. It consists of a slipway and hardstand area. The proposed slipway is of concrete construction. It is 15m wide with a crest 12m in length and a sloped length of 63m at a gradient of 1:9. Between the slipway and the existing shoreline on it's western side it is being proposed to fill this area in to enlarge the available hardstand area for storage of material and equipment
The brief summarizes the pattern across all 168 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21/754The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief