Applications tied to the site
Partial coverage12 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
12 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 192 decisions within 5 km, 12 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
12 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
12 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of 3no. standalone office pods with associated landscaping which are ancillary to the existing Brookpark Enterprise Centre
(i) Permission to construct a single-storey extension to the previously approved storage building (granted under Ref. No. 19/822) for use as light manufacture / storage (ii) permission for retention of revised location of loading bay to the aforementioned storage building and (iii) associated site works, all to the rear of existing retail building
Construct a detached single storey store building to the rear of existing retail building
Construction of a machinery plant storage unit with office space and the installation of a treatment plant with percolation area
Construction of a two storey dwelling with septic tank, percolation area and associated site works
To construct a spectator stand to main playing pitch and a 1.5m perimeter paved walk with lighting around both playing pitches
The brief summarizes the pattern across all 192 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/147The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief