Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 145 decisions within 5 km, 10 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
(a) Retention of land reclamation works undertaken on-site which involved the infilling of 11,623 m3 of inert fill material over an area of 0.67 hectares. (b) Retention of material change of use of the site; from a site used as agricultural land and for the keeping of horses, to a site used as a timber cutting and carving yard. (c) Retention of timber shed structure previously constructed and currently used on-site for storing timber cutting and carving equipment and material (4 m x 6.5 m shed, 26 m2 gross floor area). (d) The development of a proposed timber storage shed (15 m x 18 m L-shaped shed, 183 m2 gross floor area) (e) The development of proposed ancillary development including; a new recessed site entrance, hedgerow screening, concrete post and rail fencing, a storm water collection and drainage system, a wastewater drainage and treatment system, and a water supply connection. (f) The erection of an advertising sign located at the site entrance (2 m x 1.5 m in size).
Planning Permission for A) The demolition of existing outbuilding B) Construction of a detached Granny Flat C) Installation of the treatment unit and percolation area to serve proposed granny flat and existing dwelling
Construction of a dwelling and domestic garage with associated site works
Permission for construction of 10 no. 2-storey semi-detached dwelling houses and all associated landscaping, new site entrance and roadways, lighting and associated site works
Permission for: (i) construction of 2 storey extension to existing dwelling, (ii) installation of 4 new rooflights to existing dwelling, (iii) installation of replacement wastewater system in lieu of existing septic tank system, (iv) all associated site works and for (v) retention of existing porch/sun-room
Permission for the retention and completion of existing domestic garage and permission for the installation of a treatment unit and percolation area to service existing dwelling
The brief summarizes the pattern across all 145 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22/170The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief