Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 93 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for refurbishment of a ruined dwelling including extension to same for use as a dwelling, installation of a wastewater treatment system and all associated site works
Permission for retention of dwelling and domestic shed as constructed
The installation of 6 no. camping pods, a reception building, installation of a treatment plant and all associated site works
To install 6 no. camping pods, a reception building, to install a treatment plant and all associated site works. An Environmental Impact Statement (EIS) has been prepared and will be submitted with the application
Planning Permission for the following: 1. Construction of a new toilet and shower facility building and new hardstanding area for bin storage. 2. Construction of a new amenity building for use ancillary to the existing pod park and camping pitches with kitchen facility to serve existing camping pitches. 3. Removal of existing toilet and shower facility building with hardstanding for bin storage area. All associated foul and storm drainage pipes in relation to same to be made redundant. 4. Connection of new toilet and shower facility building and new amenity building to proposed wastewater treatment system as granted under Pl. Ref. No. 24/00056 which has not been constructed yet. 5. All associated site works
Permission for Retention for: (A) 16 no. camping pitches, (B) 2 no. parking spaces for campervans, (C) Toilet and shower facility building, hardstanding for bin storage and all associated site works, (D) Existing vehicular entrance serving the pod park permitted under Pl. Reg. No. 18/788 and the camping facility stated in A-C above. Permission is also sought to construct a waste water treatment system to serve the camping facility and all associated site works
The brief summarizes the pattern across all 93 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/200The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief