Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 302 decisions within 5 km, 10 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of 36 no. residential units comprising 14 no. 3 bed, 16 no. 2 bed and 6 no. 1 bed units in a mix of townhouse, apartment, simplex and duplex units on a site at a medium density of 33.1 units per hectare. The proposed scheme is located on a site to the rear of the existing Saint Patrick's Boys National School and is accessed off Cork Road, Gortnaclohy, Skibbereen, County Cork. The proposed development provides for a pedestrian crossing, car parking, bin storage, play areas, public lighting, landscaping, drainage, car parking, shared surfaces, rationalisation and improvements along the L9800, and all associated site development works
Construction of 36 no. residential units comprising 14 no. 3 bed, 16 no. 2 bed and 6 no. 1 bed units in a mix of townhouse, apartment, simplex and duplex units on a site at a medium density of 33.1 units per hectare. The proposed scheme is located on a site to the rear of the existing Saint Patrick's Boys National School and is accessed off Cork Road, Gortnaclohy, Skibbereen, County Cork. The proposed development provides for a pedestrian crossing, car parking, bin storage, play areas, public lighting, landscaping, drainage, car parking shared surfaces, rationalisation and improvements along the L9800 and all associated site development works.
The construction of 14 no. residential units comprising 6 no. 4 bed, 6 no. 3 bed and 2 no. 2 bed units on a site located to the rear of the existing Saint Patrick' s Boys National School and is accessed off Cork Road, Gortnaclohy Skibbereen, County Cork. A portion of the proposed site is also proposed for a change of use from agricultural to educational to be used in future by the adjacent school. The proposed development provides for car parking, drainage, landscaping and all associated site development works
Permission to demolish two existing temporary classrooms and to construct a series of extensions to the front and rear of the existing school to form a new ASD classroom, resource room, storage room, WC's and all associated external works and servicing and landscaping
The demolition of the former Gaelscoil (temporary building)
Construction of a new car park with associated site works, on the site of the former Gaelscoil
The brief summarizes the pattern across all 302 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/305The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief