Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 311 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a new single storey detached dwelling with associated single storey detached garage, a new wastewater treatment unit and percolation area, a new site entrance and including all associated site works and landscaping
Permission to construct a new sunroom to front of existing dwelling along with a new two storey extension to rear of existing dwelling
To construct a new garage.
Permission to construct a new two storey dwelling, garage, site entrance, wastewater treatment system and all associated site works and services.
Permission for 1. The retention of an existing 85m high telecommunications structure carrying associated antennae and infrastructure to provide mobile phone coverage in the area, and to support the dedicated communications networks in the area for the state’s emergency services. It is also proposed to retain the control building and associated infrastructure to provide the power supply for the tower infrastructure including for aviation warning lights. 2. The installation of 74m of 2.4m high green palisade fence to bound the retained building, communications tower and associated infrastructure.
Construct a two storey dwelling with effluent treatment Unit, and percolation area, access to roadway and all associated site works.
The brief summarizes the pattern across all 311 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/4145The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief