Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 153 decisions within 5 km, 10 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Cead pleanála iomlán a lorg chun síneadh dhá urlár a chur leis an scoil, ag cur san áireamh, staighre éalaithe, doras éalaithe, athraithe ingearchló, ag cur fuinneog san áit ina bhfuil an doras éalaithe faoi láthair thuas staighre, chomh maith leis na hoibreacha láithreáin a bhaineann leis an suíomh - Full Planning Permission for a 2 storey extension to the school including emergency stairs and emergency exit, changes to elevations, insertion of window in place of existing emergency exit upstairs, as well as associated site works.
Cead pleanála iomlán a lorg chun athchóiriú, méadú agus cur leis an bhfoirgneamh atá ann. San áireamh, beidh oifig nua aon úrláir á thógáil ar chúl na scoile, díonta claonta nua in áit díonta léibhéala, an simné á bhaint agus airde de bhuaic díon halla na scoile á árdú. Ina theannta beidh gá ingearchló na scoile a athrú, doras tosaigh nua don halla, cuid de falla teorainn a bhaint, chomh maith leis na hoibreacha láithreáin a bhaineann leis an suiomh. (Full Planning Permission for alterations and extension to existing school building including construction of single storey office to rear of school, new sloping roofs to replace existing level roofs, removal of chimney and raising of the apex of the school hall roof. Works will also necessitate alterations to elevations, new front door for the hall, removal of part of partition wall, as well as all associated site works).
A)Demolition of existing dwelling & b)construction of 2 no. semi-detached dwellings together with associated entrances & site works.
(a) Construction of an eighty-five bed residential nursing home with ancillary facilities and associated site works to service the development. (b) Demolition of exiting petrol station, shed and ancillary structures. (c) New entrance/exit and car parking facilities.
Cead pleanála a fháil le haghaidh a) Athlonnú agus domchlá nua ar an bpáirc atá ann agus draenáil atá oiriúnach. b) Cuir isteach cosán nua, fál liontán sreinge agus tuilsoilsiú timpeall na páirce. C) Ag tógáil botháin agus binsí nua. d) Ag tógáil seastán nua. e) Dromhclá crauidh ar an gcarrclós nua. f) Soilsiú poiblí nua timpeall an suiomh ar fad agus na suíomhanna coimhdeach ag Pairc Abán, An Portach, Baile Mhic Íre, Maigh Chromtha, Co. Chorcaí. / Naomh Abán CLG is applying for Permission for; a) Relocation and resurfacing of the existing pitch, including appropriate drainage. b) New footpath, wire mesh fencing, and floodlighting around the pitch. c) Construction of new shelters and benches, d) Construction of new stand, e) Hard surfacing on the new carpark, f) New Public lighting around the entire site and associated areas at Páirc Abán, An Portach, Baile Mhic Íre, Maigh Chromtha,
Chun leathnúchán a chur leis an gcarrchlós atá ansin faoi láthar, agus cosáin nua a thógáil chomh maith le hoibreacha laithreáin a bhaineann less. / Extension to existing carpark, and construction of a new footpath as well as associated site works. At Údarás na Gaeltachta Business Park, Ballymakeery, Co.Cork
The brief summarizes the pattern across all 153 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/4165The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief