Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 162 decisions within 5 km, 10 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Upgrade of existing playing field to include drainage, regrading of field, installation of goalposts, ball netting, flood lights and associated site works. The development consists of works within the curtilage of a Protected Structure.
Permission for construction of new single storey extension to the north of the existing school to provide for 2 no. SEN classrooms and other ancillary accommodation, proposed new external play areas, modifications to the existing 2 no. vehicular entrances on the northern boundary onto the public road (L3804) to include footpath and setdown area, provision of new pedestrian entrance on the northern boundary, modifications to parking and set down arrangements to the northern side of the school extension including the provision of new ball court area, along with all relevant site development works. (A Protected Structure - reference Cork RPS ID NO. 425).
Construction of an all weather playing pitch with perimeter fencing, ball wall, floodlighting and all associated site works. The development consists of works within the curtilage of a Protected Structure.
The construction of an 18 metre high free standing communications structure with its associated antennae, communications dishes, ground equipment and all associated site development works. The development will form part of Eircom Limited existing telecommunications and broadband network.
Construction of a 270.4m² woodworking and joinery workshop with new site entrance (existing entrance to be blocked up), all associated drainage, service connections, hard surfacing and site works to facilitate the development
Construction of an extension to rear of existing dwelling including elevational changes and associated works.
The brief summarizes the pattern across all 162 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/4246The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief