Applications tied to the site
Partial coverage12 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
12 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 296 decisions within 5 km, 12 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
12 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
12 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a single storey family dwelling and the installation of a wastewater treatment plant and all associated site works
To construct a new single storey family dwelling, the construction of single storey domestic garage and the installation of a waste water treatment plant, and all associated site works.
Retention of an extension to the lower level floor plan, amendments to the upper level floor plan and elevational changes to an existing 2-storey family dwelling
The construction of a dwelling house, garage, septic tank, percolation area and all associated site works
A) the demolition of an existing office / amenity building and 2 no. over ground tanks. The construction of: b) a two storey office / amenity building c) 3 no. over ground water storage tanks d) a fire water retention lagoon e) all associated site works. An Environmental Impact Assessment Report (EIAR) & Natura Impact Statement (NIS) has been prepared and shall be submitted to the Planning Authority with this application
A) The construction of a pedestrian underpass on the L-8107-0 providing access from the staff carpark to the factory building, b) the construction of a building over an existing mechanical plant within the waste water treatment plant as granted under planning 17/162 c) all associated site works. This application relates to an establishment which has an Industrial Emissions License & an Integrated Pollution Control License (P0947-01).
The brief summarizes the pattern across all 296 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/4271The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief