Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 132 decisions within 5 km, 10 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for the change of use of a disused classroom into a childcare facility to include, breakfast club, morning and afternoon preschool ECCE sessions, afterschool services, and installation of emergency escape door and associated works
Construction of a shelter roof to rear of existing school building and associated site works.
Permission for the following 1) relocate the existing childcare service from its current location to an alternative classroom within the main school building and for the change of use of this same classroom into a full day-care childcare service, 2) revert the existing childcare service room back into a classroom, 3) all associated site works.
Permission for retention for extension as constructed to side of existing dwelling, and permission for the demolition of existing shed attached to existing dwelling, construction of a new extension and elevational changes to existing dwelling, new vehicular entrance and all associated site works.
To construct a new dwelling house.
To construct a one and a half storey dwelling, entrance and a wastewater treatment system.
The brief summarizes the pattern across all 132 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/4289The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief