Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 413 decisions within 5 km, 6 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedCitations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
Permission for retention of extension as constructed to front of dwelling and retention of addition of window at first floor level on rear elevation of dwelling.
Demolition of front boundary wall to provide pedestrian and vehicular access outlined as per submitted drawings and all ancillary works.
Construction of single-storey extension to end-terrace two storey dwelling.
Permission for Retention to retain indefinitely as built attic conversion into attic storage complete with velux rooflight on front and rear roof slope and dormer windows on rear roof slope and Permission to construct a single-storey extension at first floor level at rear of existing two-storey dwelling, demolish front boundary wall and construct 2 no. car parking spaces at front of dwelling and all associated site development works.
Permission to construct a new side and rear two storey residential extension onto existing dwelling along with all associated site works and services.
To construct 2 no. residential serviced sites and all associated ancillary development works including vehicular access, footpaths, drainage and landscaping.
The brief summarizes the pattern across all 413 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22/4347The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief