Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Parkmountain Youghal Co. CorkOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Parkmountain Youghal Co. Cork

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

6% of nearby decided applications were refused. The site check found 435 decisions within 5 km, 4 exact-site or onsite candidate records, and 2 structured appeals.

Matched source
22/4363
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

4 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

2 structured nearby appeal records.

2 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

435Nearby applications
4Site-linked candidates
6%Nearby refused
2Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

22/4363

The development of 2 no. extensions to the existing school, comprising of a 2-storey, 6 classroom block with ancillary teaching rooms of 1810m2 in area, to the north end of the existing school; and a new single storey Special Needs Unit of 600m2 in area, comprising teaching and ancillary rooms to the south end of the existing school, with additional car parking spaces provided on the site, and associated ancillary hard and soft landscaping works.

Granted0.0 km13 April 2022
21/4356

To erect on a temporary basis (for a maximum period of five years) six classrooms, in two prefabricated single-storey buildings detached from the main school building, together with all associated site works.

Granted0.1 km09 April 2021
22/4735

Erection of 2.4m high metal palisade fences with gates between the existing clubhouse and the south-western and north-eastern site boundaries, 1.2m high green pvc coated wire mesh fence behind the front (south-eastern) boundary wall (with a 1.2m high pedestrian gate at the east end of the front boundary) and on the south-western return boundary in front of the club house, a 2.4m high metal palisade fence to the side (south-western, behind the clubhouse) and rear (north-western) boundaries of the club property, together with all associated site works

Granted0.1 km26 May 2022
21/4355

(a) construct a new all-weather synthetic grassed playing pitch, (b) erect floodlighting around the perimeter of the proposed playing pitch, (c) erect new perimeter fence around the proposed playing pitch and associated site works.

Granted0.3 km09 April 2021
25/5807

Permission to construct two outdoor padel courts incorporating glass walls and steel mesh enclosures with integrated flood lighting, a new pedestrian entrance gate, public advertising signage and all ancillary site works and services.

Granted0.4 km08 April 2026
24/4318

Permission for the construction of a three-storey primary care centre including a general practitioners surgery and HSE facilities comprising of waiting areas, consulting & meeting rooms, offices and ancillary accommodation on an existing greenfield site. The proposed development will also consist of a single-storey ancillary store building. Site development works include site clearance, new pedestrian entrances off Chickley's & Springfield Road, alteration to existing site boundary treatments & new site boundaries within Youghal Business Park, alteration to vehicle entrance & footpath on Springfield Road, new vehicle site entrance within Youghal Business Park, car parking, bicycle shelter, site lighting, hard and soft landscaping, free standing totem signs, wall mounted signage and all associated site works.

Granted0.4 km23 October 2024

The brief summarizes the pattern across all 435 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required