Applications tied to the site
Partial coverage13 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
13 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 181 decisions within 5 km, 13 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
13 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
13 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Demolish existing structures to allow for the construction of 4 no. 3 bedroom dwellings, 6 apartments and associated site works on a site of approx. 0.16Ha.
The retention and completion of works to the rear and the refurbishment of existing vacant buildings for the provision of 6 No. two storey dwellings with single storey extensions to the rear of each unit, revised window and door openings on the front elevation and all associated site works.
The conversion of part of ground floor of existing dwelling to mixed retail and incorporation of converted space into existing shop, permission for an off-licence, alterations to external façade and front elevation. Addition of shop front and associated signage, alteration to existing shop front and alteration to existing signage incorporating additional trade related signage.
The construction of 31 no. dwelling houses and all associated ancillary site development works including access onto Main Street and the Fermoy Road, parking, drainage, landscaping and amenity areas. Extension of Duration to Permission granted under Planning Ref. No. 19/5486.
The construction of 31 no. dwelling houses and all associated ancillary site development works including access onto Main Street and the Fermoy Road, parking, drainage, landscaping and amenity areas. Extension of Duration to Permission granted under Planning Ref. No. 19/5486
A 7-year planning permission for the construction of a temporary wastewater treatment plant to serve a residential development permitted under Cork County Planning Ref. 19/5486 and all associated ancillary site development works. The temporary wastewater treatment plant will replace 4 no. dwellings that were permitted under 19/5486.
The brief summarizes the pattern across all 181 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/4388The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief