Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 782 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a new and upgraded entrance to replace existing agricultural entrance. The new entrance is required to access lands zoned industrial.
Permission to convert the existing two-storey outhouse building to a dwelling, elevational changes, construct a new single storey link & side extension, install 3no. rooflights to existing rear roof, demolish the existing side attached domestic storage shed, install a new waste water treatment unit & percolation area, construct a new vehicular entrance & all associated site works to their property.
The provision of an additional temporary post-primary school accommodation by way of construction of 8 no. prefabricated buildings (c 364 Sq.Mtrs, 318.5 Sq.Mtrs, 318.5 Sq.Mtrs, 80.1 Sq.Mtrs, 127 Sq.Mtrs, 100 Sq.Mtrs, 30 Sq. Mtrs, and 30 Sq. Mtrs ) on a defined site area (c 0.831 Ha) with associated site works, including provision of hard surface play area, entrance, set down area, car parking, boundary treatments, bicycle parking etc. Temporary permission for a period no longer than 5 years is being sought.
Continuation of use for a further three years for Office Unit (2A) as Secondary school (Previously granted under planning reg. no. 16/4328 & 19/4738) for a further 3 years including all associated site works and facilities including external fenced storage enclosure, high fenced play area, 2 no. free standing school signs, 3 no. school warning signs and all associated drainage and site works to be located on the grounds
Continuation of use for a further three years for 2 no. blocks of temporary single storey pre-fabricated buildings, (previously granted under planning reg.no. 19/4400) located to the north east of the existing Carrigtwohill Community College (existing unit 2a), block no. 1 containing 2 no. general classrooms, science room & preparation room, block no. 2 containing 3 no. general classrooms and toilet accommodation, and all ancillary site works to be located on the grounds.
The development consists of 2 no. blocks of temporary single storey pre-fabricated buildings, located to the north east of the existing Carrigtwohill Community College (Existing Unit 2A), Block No. 1 containing 2 no. general classrooms, science room & preparation room, block no. 2 containing 3 no. general classrooms and toilet accommodation, and all ancillary site works.
The brief summarizes the pattern across all 782 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/4478The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief