Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 322 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
Permission to construct a single storey flat roof extension to the western side of the existing dwelling house and all associated site works
Construction of a two storey, four bedroom detached dwelling house, single storey detached garage and all associated site development works.
(a)Retention of the existing site entrance and of the existing site boundaries, (b) planning permission for (1) elevational changes (2) Construction of a combined single storey and 2 storey extension at the side and rear of the existing dwelling (3)) to demolish the existing sun room (4) to decommission the existing waste water treatment system and to construct a new waste water treatment system and polishing filter. (5) to relocate and construct new site boundaries leading to an increase in site area and (6) all associated site works.
A dwellinghouse, an effluent treatment system and associated site works.
The construction of an 18 metre high free standing communications structure ( total height with antennas 18.1 metres) with its associated antennae, communication dishes and ground equipment. The development will form part of Eircom Ltd existing telecommunications and broadband network.
Construction of a part 2 storey dormer and part single storey dwelling house; demolition of vacant agricultural shed, demolition of part of agricultural shed south facade to make new ope to accommodate parking a vehicle, decommission an existing septic tank, and to provide a new waste water system for domestic use, all necessary landscaping and ancillary site works.
The brief summarizes the pattern across all 322 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22/4493The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief