Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 716 decisions within 5 km, 8 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To apply for a temporary permission for the provision of single storey pre-fabricated office and general lab building. The development also includes the provision of a temporary covered walkway connecting the proposed temporary office accommodation to the existing innovation centre, car parking, cycle parking and all ancillary site development works. Access to the proposed development will be from the existing entrance to the IDA Business park.
Permission for the extension and expansion of the existing stryker innovation centre and all ancillary site development work. The proposed development provides for the construction of a four-storey extension to the rear of the existing innovation centre. The proposed development includes the relocation and extension of an existing surface car park to southern areas of the site, the provision of a multi-shelter structure accommodating bicycle parking and smoking area, rooftop PV solar panels, signage, storage yard and waste compound/recycling building, and a pedestrian/cycle connection to the existing greenway to the south of the site. The proposed development also includes minor elevational and internal alterations to the existing innovation centre building. A Natura impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application.
Alterations to the extension and expansion of their existing facility permitted by Cork County Council planning references 23/5968 and 23/6412 and all ancillary site development works. The proposed development includes alterations to planning reference 23/5968 comprising the omission of a permitted detention basin and replacement with Stormcell attenuation system. The proposed development also includes alterations to planning reference 23/6412 comprising: (i) The construction of a revised extension to the existing GE Healthcare building comprising a filling line, solution preparation and utilities building with an approximate maximum height of 13 metres (reduction from approximate maximum height of 27 metres). (ii) The reduction in area and reconfiguration of the permitted utilities yard/contractors compound to include a utilities building, electrical building, pump house, waste compactor building, nitrogen tank, mains water tank, piperacks to the proposed new filling line and solution preparation building and all ancillary plant and service infrastructure. The works provide for the maintenance of the existing project cabin and workshop buildings on site, with partial demolition of the workshop building. (iii) The relocation west of the existing vehicular site entrance from the north and associated realignment of the internal service road within the site. (iv) All other ancillary site development and enabling works which include rooftop PV panels, signage, revised servicing and drainage proposals, landscaping works and establishment of a temporary construction compound (area to be reinstated post construction phase) A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
(1) To relocate the existing single storey gas bottle store (2) To relocate the existing single storey waste compactor enclosure and (3) All associated site development works.
(1) To construct a new single storey extension of total area 750sqm to the western side of the existing main building containing a new high-speed Filling Line to replace the existing filling line on the current site for final product filling, (2) modifications to existing car parking area to suit proposed extension. (3) all associated site development works.
To construct a single storey sprinkler pump house, and two associated sprinkler tanks to the south of the existing production facility, including all associated external site works.
The brief summarizes the pattern across all 716 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/4567The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief