Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,255 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Removal of external inclined conveyer system to warehouse as permitted under Cork County planning Ref. 06/13900 and replacement with vertical elevator and associated pit and a horizontal enclosed conveyor with supporting bridge structure and all associated site works
Permission is sought for the installation of three liquid storage tanks within an existing bunded area and all associated pipe works and site works at an existing tank farm
Permission for the construction of an electrical building and all ancillary site development works at their production facility at Ballintaggart and Ballybricken townlands, Ringaskiddy, Co.Cork. The proposed development is covered by an existing Industrial Emissions Licence No. P0013. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accidents Regulations will be submitted along side the application
I) Modifications to the north, south and east elevations of the existing Organic Synthesis Production Building No. 4 (referred to as OSP4), ii) the demolition of the cantilevered window on the eastern elevation at second floor level of the existing OSP4 Production Building, iii) the construction of a single storey electrical room and control room extension at second floor level to the east of the existing OSP4 Production Building and iv) all ancillary site development works, at their production facility. The proposed development is covered by an existing Integrated Pollution Control Licence No. P0013-04. The development refers to a modification to an establishment to which the Major Accident Regulations applies.
Permission for an upgrade and extension to the existing biomedicines manufacturing facility, including: 1) construction of a part single-storey and part two-storey extension to the northern elevation of the existing production building P01 with total floorspace of c. 1,718 sqm and a maximum height of c23.01m, 2) construction of a new medium voltage and low voltage (MV &LV) electrical sub-station with 2 no. single storey over service void building units with total floorspace of c.346sqm and maximum height c.6.33m, and to include a back-up generator, 3) construction of an extension to the existing central utility plant (CUP) to accommodate new boiler, heat pumps and plant rooms with total floorspace of c.482sqm and maximum height to parapet, c.14.2m and to include demolition of an existing boiler house of 68.6sqm, 4) works to upgrade and expand the existing on-site Waste Water Treatment plant (WWTP) incorporating new plant and equipment for increased hydraulic and biological treatment capacity; including a new single storey electrical substation with total floorspace of c.233sqm and maximum height c.5.29m, back-up generator, cooling towers, and odour control unit, 5) all associated site development, landscaping and ancillary works including re-profiling of the earthen berms in the vicinity of the WWTP and associated demolition works, boundary fencing, underground services, high-level pipe and cable racks, internal site roads, yards and temporary construction compounds. This application relates to development, which comprises an activity, which holds an Industrial Emissions Directive Licence (reg. no. P0778-02). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in respect of the development.
(i) 1 no. 3-storey office extension to the existing administration building with a floor area of approximately 2,721 square meters, an overall parapet height of 16.3 meters and connected by overhead passageway to the southern elevation of the administration building; (ii) temporary continuation for a further 2 years of use of the existing 4 no. single-storey, 360 square meter pre-fabricated temporary modular office units permitted under planning reference 16/07150; (iii) permanent continuation of use for the existing 95 no. car spaces temporarily permitted under reference 16/07150. The development will include associated works for local site roads, footpaths, connection to underground services, landscaping and site works. The proposed development is located on lands approximately 1.32 hectares within the existing permitted manufacturing campus. This application relates to development which comprises an activity which holds an industrial emissions directive licence (Reg. No. P0778-02)
The brief summarizes the pattern across all 1,255 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/4577The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief