Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 271 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission to construct dwelling, modify existing entrance, waste water treatment system and all associated site works
The construction of a rear single storey extension to existing dwelling
The demolition of 2 existing non period sheds, alterations to elevations and refurbishment of existing house and construction of part single storey and part 2 storey extension to side and rear of existing single storey dwelling, upgrading existing septic tank to a new biofiltration treatment plant, a new vehicular access and all associated site works - Extension of Duration to Permission granted under Planning Ref. No. 17/4031
Permission to construct an extension to southwest gable of existing dwelling house.
Retention and completion of dwelling house all associated site works and permission to install a wastewater treatment system.
Retention of demolition of dwelling house, retention and completion of dwelling house under construction and retention of hardcore area around dwelling house and planning permission to install a wastewater treatment system.
The brief summarizes the pattern across all 271 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/4717The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief