Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 730 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Alterations and extensions to existing chemical process and mixing building, to include extensions to south and west of building and new raised roof over entire building, also to include canopy on north side of building over part of existing hardstand storage area and all associated site works
Demolition of existing commercial garage and erection of storage building including security office.
Permission for 1) construction of a single storey shed building comprising of 2 no. workshops and a W.C, 2) relocation of existing site entrance further north and provision of a widened 4m wide entrance for vehicular and pedestrian access, 3) provision of 10 no. car parking spaces inclusive of 1no. accessible car parking space, and 4) all ancillary works necessary to facilitate the development inclusive of landscaping, drainage (including the provision of a rainwater harvesting system on site, and the provision of rooftop solar panels
Permission for Retention of the following:- 1) Modifications to the works as granted previously under planning Ref 17/6524 including increased size of ground floor front extensions, additional glazing to the front & sides, metal & stone cladding & a flat roof over the front extension, 2) Rooflights in the single storey roof to the rear of the dwelling, 3) Retaining walls & raised patio area to the front of the dwelling, 4) Detached metal garage to the side of the dwelling, 5) All other associated site works.
Demolish existing single storey storage and office/administration buildings ancillary to workshop, construction of a single storey extension for office/administration use ancillary to existing workshop use (mechanical services/steelwork fabrication), Permission for construction of new carpark area to cater for 9 number car parking spaces and for new boundary walls to replace the remaining demolished single storey buildings, Retention of single storey extension, and Permission for all associated site works.
Permission to demolish existing single storey bungalow as well as two domestic sheds, and construct two (2no.) detached, storey and half dwelling houses including the formation of new combined site entrance for both dwellings and additional access driveway to serve one of the dwellings, new site separation boundary, between both dwellings and retain one domestic store, shared between the two new dwellings, complete with all site services and site development works.
The brief summarizes the pattern across all 730 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/4828The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief