Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 81 decisions within 5 km, 8 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of new dwellinghouse and domestic garage, new entrance, wastewater treatment system together with all other ancillary site works
Construction of a dwellinghouse, the installation of a packaged wastewater treatment system and all associated works
Construct an agricultural building consisting of a milking parlour, dairy, plant room, roofed cattle holding yard, roofed cattle handling yard, cattle house with slatted slurry tank, calf house and slatted soiled water tank, permission to construct a feed storage bin and carry out all associated site works
An extension of 2.1ha to the south of the permitted existing operational quarry made up of 1.6ha of extraction area footprint and 0.5ha of perimeter earthen screening berms, a new internal quarry access road, with earthen screening berms, extending north from the existing quarry road and located east of the existing quarry void, providing access at the north-eastern corner of the existing quarry floor, the new road will require the demolition of a corrugated-clad farm shed, the construction of a new wheel wash along the new access road, installation of a new borehole for water supply, rock extraction by blasting over the extension area; continued processing of rock using the existing processing plant, including crushing and screening plant, and use of existing quarry infrastructure including quarry entrance and part of access road, site office, septic tank & Puraflo wastewater treatment system, fuel storage shed, weighbridge, stores, settlement pond, storage of aggregate and all associated ancillary infrastructure. A fifteen-year quarry lifespan is sought. An Environmental Impact Assessment Report is being submitted to the planning authority with the application
Installation of wastewater treatment system for existing dwelling house
Retention of fenestration changes to dwelling and enlargement of conservatory and for change of site boundaries to dwelling permitted under planning ref. 06/100 and associated site development works
The brief summarizes the pattern across all 81 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/484The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief