Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 685 decisions within 5 km, 8 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a road to accommodate a land train and walking tours extending into the Garden Stillhouse Area and consists of the carrying out of works to a protected structure. The proposed works will include alterations to 2 no. sections of the northern boundary wall of the Distillery site to provide (i) access to the Garden Stillhouse Area consisting of the construction of a new ramp, stairs and wheelchair lift and (ii) an emergency evacuation route for the land train. the proposed development will include a new refuge structure, fencing, landscaping including a berm and all ancillary site development works. The proposed development is for modifications to an establishment to which the Major Accident Directive applies
Retention of existing 2 no. adjoining classroom units, hard and soft landscaping, and all other associated ancillary site works at Midleton College, School-Land, Midleton, Co.Cork which is in the curtilage of Midleton College which is a protected structure (RPS No.10)
Retention of 4 no. pot still vents and 4 no. associated lightening masts to the roof of an existing still house. The proposed development is for modifications to an establishment to which the Major Accident Directive applies and is for the purposes of activity requiring an integrated pollution control license [Industrial Emissions Directive (IED) License].
Installation of a separate prefabricated modular building (to be used as a locker room) and ancillary site works
Permission for the retention of existing 6.no single storey prefabricated modular pods (for use as isolation units in accordance with covid-19 guidelines for schools) and all ancillary site works.
Change of use of an existing outbuilding from store into a chapel/meditation space along with permission for restoration of the building, construction of a single storey extension to the rear, and all other ancillary site works. The outbuilding is in the curtilage of Midleton College which is a Protected Structure (RPS no. 02517).
The brief summarizes the pattern across all 685 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/4988The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief