Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 144 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1)the retention of an extended underground slurry tank to serve dairy cows, (2) the retention of concrete feed apron, (3) the retention of an extension to existing shed to serve as calving area, (4) the retention of a second smaller underground slurry tank below calving area, (5) the retention of re-roofing of existing shed, (6) the retention of canopy constructed between two sheds, (7) retention of the demolition of 2 no old store houses, (8) retention of machinery shed and (9) retention of an erected 12 tonne feed bin. Permission for (10) the construction of an extension to cow shed, (11) the demolition of an existing underground slurry tank to rear of milking parlour, (12) the construction of a new larger underground slurry tank to the rear of milking parlour and (13) all associated site works.
Permission to construct extensions to the side and rear of existing dwelling house and construct new front entrance porch
Permission to construct a livestock underpass under the public road, effluent holding tank and carry out all associated ancillary site works.
Retention of the existing underground slatted effluent storage tank and permission to construct a new bovine livestock slatted unit incorporating existing cubicle house and sheds with 2 no. underground effluent storage tanks and a new uncovered silage slab with all associated site and ancillary works.
Dwellinghouse, garage, on site treatment system and percolation area, new entrance gates and associated site works
To (i) demolish existing open slurry pit (ii) construct a new easy feed slatted livestock unit adjacent to existing farm building. Proposed livestock unit to incorporate easy feed, crush and associated underground slurry storage tank with 2 external agitation points and ancillary external concrete (iii) construct a dungstead and ancillary concrete (iv) construct a concrete wall and railing (v) erect a meal bin. The above development to be carried out with all associated ancillary site works.
The brief summarizes the pattern across all 144 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/5003The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief