Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 140 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
(i) construction of ball wall and astro turf playing surface, along with flood lighting for the astro turf playing area (ii) associated site development works and (iii) retention of vehicular entrance (replacing agricultural entrance) and parking area.
Permission for: 1) construction of gym and 2) installation of 28 public lights, 4m high, along walkways around the perimeter of both playing pitches
A) conversion of an existing mainstream classroom to a central activities space and associated alterations to elevations (b) construction of a special educational needs (SEN) base extension to the east of the existing facility consisting of 1 no. mainstream classrooms, 2 no. classroom safe bases, 2 no. small safe places, 1 no. toilet and shower area, 1 no. multi-sensory room, 1 no. staff toilets, 2 no. storage rooms, 1 no. linen room and an office along with play area and proposed yard extension at the existing school and all associated site works.
(a) Retention of existing pre-fabricated single storey classroom to the south of the existing facility, (b) Permission for construction of new classroom, new wheelchair w.c. for assisted users and new resource room to the north of the existing facility and (c) Construction of a new staff room and entrance to the east of the existing facility along with all associated site works
Permission for a Community Playground including playground equipment, fence and gates, and all ancillary site works.
The construction of new dwellinghouse, domestic garage, new entrance, septic tank and percolation area together with all other ancillary site works.
The brief summarizes the pattern across all 140 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22/5116The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief