Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 235 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of single storey extensions to existing split-level dwelling, modifications to said dwelling, the upgrade of the current foul drainage infrastructure by decommissioning the existing septic tank and cess pit wastewater treatment system and the installation/construction of a new tertiary wastewater treatment system, revisions to the vehicular entrance arrangements to facilitate sightlines and all associated site works.
Permission to (1) demolish an existing dwelling house, (2) construct a new dwelling house to replace the existing dwelling house demolished, (3) the upgrade of the current foul drainage infrastructure by decommissioning the existing septic tank and cess pit wastewater treatment system and the installation /construction of a new tertiary wastewater treatment system as per approved planning application no. 22/5168, (4) revisions to the existing vehicular entrance arrangements to facilitate sightlines, (5) new vehicular entrance, (6) new rainwater soakpits, (7) ancillary works and (8) all other associated site works.
Refurbishment and alteration to existing dwelling and construction of new single storey front extension and a new single storey rear extension, installation of the waste water treatment unit and all associated site works.
Permission for: 1) Alterations & extensions to an existing dwelling including the following:- Demolition of an existing rear porch, construction of a new single storey flat roof rear extension & elevational alterations including modifications to existing opening sizes, the removal of a chimney & the addition of a new rear facing attic level rooflight. 2) Construction of a detached ancillary structure on the site for use as a home office/garden room. 3) Construction of a new detached stable structure on site. 4) All other associated site works.
Permission to construct a new dwelling house.
Permission consequent to construct dwelling, treatment system, private well, domestic shed, entrance and all associated site works
The brief summarizes the pattern across all 235 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/5168The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief