Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 735 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for the construction of an access road, a temporary unsurfaced carpark, temporary security hut, temporary bus shelter building, temporary portaloo toilets, temporary lighting, temporary fencing and ancillary works.
Construction of a temporary unsurfaced carpark, temporary lighting, temporary fencing and ancillary works.
Construction of ESB substation. The ESB substation including an adjacent switchroom will be 3.375m high, 7,650m long and 4.360m wide (change of location from that previously permitted under Pl.Reg.20/4090)
The development will consist of (1) a single storey laboratory building to include plant and equipment area, office area, meeting rooms, canteen and kitchen, staff toilets, laboratories, IT room, electrical switch rooms and store rooms. The main laboratory building is 6.1 metres high, 44.5 metres long and 21.5 metres wide with vertical brise soleil screen offset from the southern facade. (2) An ESB substation of 3.18 metres high, 4.83 metres long and 4.32 metres wide is proposed to the rear of the building adjacent to the proposed service yard to the north of the main laboratory building. (3) The proposed development also includes 19 No. new car parking spaces comprising 2 No. visitor parking bays, 5 No. car pool parking bays. 1 No. wheelchair accessible parking bay, 2 No. dedicated electric vehicle charging bays, 2 No. motorcycle parking spaces and a covered bicycle shelter. (4) The proposed site works will include a 2.2 metre high, full perimeter security fence with new vehicular entrance gate and pedestrian turnstile entrance to the south east corner of the site, new entrance/exit to the proposed site, internal access roads pedestrian pathways, underground and overhead utilities, landscaping and all other associated site works.
Construction of flood management scheme consisting of flood defence embankments, an overflow culvert, an attenuation pond, headwalls and outfalls, electrical cabinet and other ancillary works. A Natura Impact Statement will be submitted to the Planning Authority with the application.
Permission for change of use from a single storey children's leisure unit (previously granted under Planning Ref. No. 06/6221) to a commercial enterprise unit incorporating golf training, customizing, alterations and modifications together with repair and supply facility
The brief summarizes the pattern across all 735 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/5378The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief