Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 487 decisions within 5 km, 9 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
Permission for the following: 1) the demolition and removal of the existing glazed porch to the front (west), existing gable wall projections and the existing roof of our dwelling, 2) to construct an additional first floor storey to our existing single storey dwelling with, 3) proposed two storey extensions to the side (south) and front (west), 4) the construction of a new single storey extension to the rear (east) with balcony over, 5) elevational changes to suit, (6) a new waste water treatment system to replace the existing system on site, and with internal alterations to suit and all associated site development works.
Permission for alterations to an existing dwelling house. The proposed development includes modifications to a previously approved development, (Planning Reference No. 22/05518) including (i) the addition of a canopy to parts of the to the South-West, South-East, North-East and North-West elevations, incorporating a balcony to the South East Elevation, (ii) proposed cladding finish to parts of the ground floor, and all associated site development works
Permission for construction of two storey dwelling house, including an on-site domestic treatment unit and percolation area together with all associated site development works.
Permission to construct a two sotrey dwelling, the installation of a waste water treatment unit, the conversion of existing cottage to office and gym and all associated site works
Retention sought for minor increases in footprint at lower ground floor and second floor levels to a dwelling house over that previously permitted under planning permission ref. no. 08/8741 and extended by 14/4160; permission for retention also sought for external walls finishes, landscaping layout and front boundary wall treatment to a dwelling house.
Permission for removal of septic tank and installation of new wastewater treatment system
The brief summarizes the pattern across all 487 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22/5518The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief