Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,245 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To erect an array of 98 PV solar panels onto the roof of their Giraffe building
Construction of a sheltered viewing structure with associated raised access walkway and site development works at the Giraffe/Zebra compound
(1) to demolish part of existing timber frame educational complex building, (2) to erect a new extension to the existing educational complex building consisting of the following: a) new 2 storey block on the western side, to accommodate education centre staff and research staff, together with students and graduates on work placement, and also to include a plant room, b) a single storey block on the southern side, consisting of 2 new class rooms and a meeting room, c) a single storey entrance hall incorporating reception area and exhibition area, d) a lecture theatre on the eastern side suitable for approx. 300 persons which is subdivided into 2 class rooms, e) an extension to the existing toilet facilities, f) upgrading of remaining part of the existing building structure to include replacement of external roof and wall cladding in order to improve energy efficiency, and also to include the installation of roof lights, g) conversion of an existing classroom into a staff canteen, h) constructing an open-air plaza with fixed canvas awning structure, i) installation of an array of solar PV panels on the roof of the western 2 storey block and also on the roof of the eastern lecture theatre, j) all associated site works including building services, access road and landscaping. The above development is to be known as the Education, Conservation and Research Centre, 'Understanding Out Sustainable Future'. A Natura Impact Statement will be submitted to the planning authority with this application.
Permission for the construction of an extension to existing dwelling house, alterations to existing site entrance, installation of new waste water treatment system and all associated works.
To construct a single storey dwellinghouse (bungalow), domestic garage, new vehicular entrance, on site bio treatment unit and associated site works.
The construction of a detached 4-bedroom family house (change of design of dwelling as approved in application no. 10/5521 and extended under application 15/6087), new vehicular entrance, connection to group waste treatment plant, connection to public water main and all associated site works
The brief summarizes the pattern across all 1,245 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/5601The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief