Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 157 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A) Permission for retention of an existing slatted cubicle house as constructed (b) permission to construct an extension to existing cubicle house to include milking parlour, dairy, collection yard, slatted tanks, drafting area and loose house (c) construct a straw/hay shed and install a milk silo and roof water collection tank.
To construct a dormer dwellinghouse with carport and garage, entrance, septic tank percolation area and all associated site works
Retention of vehicular entrance as constructed on site and retention of detached domestic garage as constructed on site and all associated site works
Permission for the construction of a new storage warehouse with ancillary office space and all associated site works. This warehouse will be used to store IT & Telecommunications equipment. This development is located within the curtilage of a protected structure formerly the Military Barracks (now an Industrial estate) RPS ID no. 52
Provision of 4no. classrooms in temporary cabins located to the north of the existing school building and associated site works.
The proposed development will comprise the construction of a new 2-storey extension to the existing school building including a 2 storey link, 7 no. general classrooms, 4 no. specialist teaching rooms, 4 no. special needs classrooms, associated ancillary facilities, together with associated site works, including car parking and set-down areas, external play areas and sensory garden, and relocation of 3 existing ballcourts. As part of the proposed development 2 no. existing temporary prefabricated buildings comprising of 6 no. classrooms will be removed off site and 1 no. prefabricated building comprising 2 no. classrooms will be retained. The site is bounded by the old barracks wall (Protected Structure RPS 00052) on its eastern side and is to be retained.
The brief summarizes the pattern across all 157 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/5645The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief