Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 159 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for the construction of a detached and one and a half storey one bedroom dwelling unit ancillary to main dwelling house, connection to public sewer together with all together ancillary site works
Permission To construct a dwellinghouse and a detached domestic garage. Extension of Duration to Permission granted under Planning Ref. No. 20/6449
To construct a dwellinghouse and a detached domestic garage
Residential development for construction of 11 no. dwelling houses, storm water attenuation system and all associated site works.
(i) upgrade of the existing underground Ballymakeera pumping station and replacement of above ground kiosk; (ii) creation of a new dedicated access to the pumping station site; (iii) decommissioning of an existing septic tank and gravity outfall pipe; and (iv) all ancillary development and associated temporary works including vehicle turning area, and perimeter fencing with access gate on to the public road.
The construction of a two storey dwelling, garage, waste water treatment system and ancillary site works.
The brief summarizes the pattern across all 159 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/5926The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief