Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

The Townlands of Fiddane, Cooliney, Ballynoran, Coolcaum & Ballyroe, Charleville, Co.Cork.Opens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

The Townlands of Fiddane, Cooliney, Ballynoran, Coolcaum & Ballyroe, Charleville, Co.Cork.

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

15% of nearby decided applications were refused. The site check found 168 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.

Matched source
22/5933
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

2 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Register indexed

No structured appeal row is currently tied to the matched decision set.

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

168Nearby applications
2Site-linked candidates
15%Nearby refused
0Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

22/5933

The installation of two 33kV electricity grid interconnectors with a combined total length of 2,217m of underground cable with a joint bay and 1,146m of over head line supported by 8 triple pole sets and 5 double pole sets, a temporary construction compound and 4 transformer stations. The proposed development is to connect the permitted but not built solar farm development at Fiddane (pl.ref 17/05799 & ABP-308846-20) to the consented but not built Ballyroe solar farm (pl/ref. 20/04041), co.Cork and the proposed solar farm development at Coolcaum to the consented but not built Ballyroe solar farm (pl.Ref 20/04041), co.Cork. The cables will be under public road and private lands. The location of the proposed development is in the townlands of Fiddane, Cooliney, Ballynoran, Coolcaum, and Ballyroe near Charleville. A Natura Impact Statement will be submitted to the planning authority with this application.

Granted0.0 km15 June 2023
22/6288

Permission for retention of unauthorised developments consisting of the following: (a) dwelling and entrances as constructed including ancillary works, (b) stables, fowl house and agricultural machinery shed together with vehicular entrance, (c) straw and hay shed, (d) domestic garage and associated site works

Granted0.5 km03 April 2023
21/5390

To construct a new garden equipment storage shed with all associated site and ancillary works.

Granted0.5 km14 July 2021
22/6889

Retention of (i) conversion of attic of existing dwelling to storage area including roof lights and gable window and (ii) elevational alterations to existing dwelling

Granted0.5 km27 February 2023
25/5110

Permission to alter existing dwelling house, to include alterations to elevations of existing dwelling house, new dormer windows and an enclosed front porch, extension to the existing detached garage, provision of renewable energy type roof panels to the detached garage roof, modifications to the existing vehicular entrance, construction of a front boundary masonry blockwork wall to replace existing front boundary fence line and permission for retention of the location of the existing bored water well.

Granted0.5 km11 December 2025
21/7246

The development will consist of:. Construction of 6 no. wind turbines with a blade tip height of 175m, rotor diameter of 150m and a hub height of 100m;. Construction of turbine foundations and crane pad hardstanding areas;. Construction of new site tracks and associated drainage infrastructure;. Upgrading of existing tracks and associated drainage infrastructure where necessary;. Upgrade of entrance onto local road L1322;. All associated drainage and sediment control including the installation of new watercourse or drain crossing and the re-use or upgrading of existing internal watercourse and drain crossings;. Construction of 1 no. permanent onsite 38kV electrical substation to ESBN specifications including: - Control building with welfare facilities; - Electrical infrastructure; - Parking; - Wastewater holding tank; - Rainwater harvesting; - Security fencing; - All associated infrastructure, services and site works.. 1 no temporary construction site compound and associated ancillary infrastructure including parking;. Tree felling to facilitate construction and operation of the proposed development;. Installation of medium voltage (20/33kV) and communication underground cabling between the proposed turbines and the proposed on-site substation and associated ancillary works;. Erection of 1 no. permanent meteorological mast with a height of 100m above ground level and associated access track;. Installation of medium voltage (38kV) underground cabling and associated ancillary works between the proposed on-site substation and the existing Charleville Substation within the townland of Rathnacally. The proposed grid connection will be installed primarily within the public road and will include 2 no. watercourse crossings and the installation of 8 no. pre-cast joint bays;. All associated site development works;. A 10 planning permission and 35 year operational life from the date of commissioning of the entire wind farm. This application for planning permission is accompanied by an Environmental Impact Assessment Report and Natura Impact Statement.

Refused0.8 km22 December 2022

The brief summarizes the pattern across all 168 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required