Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 271 decisions within 5 km, 4 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(a) Permission for retention of existing hard standing area, (b) Permission to concrete over existing hard standing area and install external steel racking, (c) Permission to construct a new steel storage warehouse and external steel racking, and all associated site works
Construction of extension to existing industrial unit and all associated site works.
The replacement of approximately 127m of existing 2.4m high chainlink fencing and associated gates with 127m of new 2.4m high green palisade security fencing/gates and all associated site works.
Permission for Retention to retain the following:- (a) Site floodlighting, (b) 2 no. ancillary single storey maintenance buildings, (c) 1 no. mobile tent structure for storage of battery powered lift machines, (d) Increase in concrete hardstanding area inside gated entrance and along north-east boundary and its use as an ancillary outdoor storage area and (e) All associated site works. Permission for the provision of a washdown separator to the existing power wash bay located on the extended concrete hardstanding.
To construct a new light industrial unit (for plant hire business) to include a two storey section to the front of the building which will consist of ancillary plant and tool hire shop and office space on the ground floor and storage/office space on the first floor and all associated site works.
Demolition of existing lean-to domestic garage and boiler house, and construction of a new domestic garage with all associated site and ancillary works. Extension of Duration of Permission granted under planning ref:13/4093
The brief summarizes the pattern across all 271 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/5936The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief