5% of nearby decided applications were refused. The site check found 315 decisions within 5 km, 9 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission to construct an all-weather pitch, planning permission to erect floodlighting to serve the proposed all-weather pitch, planning permission to erect floodlighting to serve an existing grass pitch and all associated site works.
Permission for construction of a new gym, extension to existing dressing rooms incorporating a meeting room & stores and permission for retention of existing unroofed ball alley and all associated works.
Upgrade the existing Castlemartyr Wastewater Treatment Plant at lands at Ladysbridge Road (R632), Castlemartyr, Co. Cork. The site is generally bounded by Castlemartyr Resort access road to the north, Castlemartyr Woods to the south, Ladysbridge Road to the east and Kiltha River to the west. The development will consist of the demolition of the existing: aeration tank; inlet works; forward feed pumping station; picket fence thickener; and site boundary post and wire fence. The development will also consist of works to upgrade the existing Castlemartyr WwTP including provision of: secondary / biological treatment facilities (including; 2 no. anoxic tanks (circa 115 cubic metres), 3 no. aeration tanks (circa 342 cubic metres); 2 no. 8 metre diameter settlement tanks); a forward feed pumping station (circa 19 cubic metres); above-ground storm-tank with circa 255 cubic metres of storage; tertiary treatment for phosphorus removal (comprising chemical dosing and filtration including 1 no. disc filter); a sludge management system (including the re-purpose of the existing clarifier tank to new picket fence thickener); an emergency stormwater overflow chamber; provision of circa 32 metres of below ground inlet sewer; circa 15 metres of below ground outfall pipeline ( to discharge flows to the existing outfall location at the Killtha River); a surface water drainage interceptor; a treated effluent outfall headwall to the Killtha River (discharging to existing outfall location); and the upgrade of the existing inlet works including 2 no. fine screens and grit removal facility. The works will also consist of: provision of a new control building (circa 79 square metres); an ESB sub-station (circa 22 square metres); a permanent back-up generator and associated fuel tank; access gates and boundary fencing; all hard and soft landscaping; manholes; and all other associated site excavation, infrastructural and site development works above and below ground. A Natura Impact Statement has been prepared in respect to the proposed development and will be submitted with the planning application.
To refurbish and erect a two-storey extension to the rear and west side of the existing dwelling. This proposed development will also include associated site ancillary works
1) New part single storey, part two storey detached dwelling, 2) Single storey link from the main dwelling to; 3) Single storey home office and commercial Beauty Salon with 2 no. treatment rooms, 4) Detached single storey domestic garage, 5) New wastewater treatment unit and all associated site works.
Construction of a 2-storey dwellinghouse with attached dormer type domestic garage, together with an on-site sewage treatment system and all associated site development works
The brief summarizes the pattern across all 315 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/5992The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.