Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 640 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct a two-storey dwelling house, domestic garage, new vehicular entrance, wastewater treatment system and percolation area and all associated site works
Construct a two storey dwellinghouse, domestic garage, new vehicular entrance, wastewater treatment system and percolation area and all associated site works
Alterations to the existing Midleton 110kV station to include a single storey extension on the northern side of the existing control building and the extension of the existing compound palisade fence to the north of the site.
Permission to retain the following a) a single storey extension to dwelling on north-eastern side of original cottage, and b) a dormer type extension to dwelling on the north-western side of original cottage.
Development of grid system services facility within a total site area of up to 0.76 hectares, to include 1 no. single storey electrical substation building, 1 no. customer switcher gear, electrical inverter/transformer station modules, containerised battery storage modules on concrete support structures, heating, ventilation and air conditioning units (HVAC units), access tracks and new site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV security monitoring system, animal fencing, earth bund and landscaping works and all associated ancillary infrastructure on land.
10 year permission to develop an Energy Storage System, which will connect to the adjoining ESB Midleton 110kV Electricity Substation. The proposed development will have a projected life span of 30 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c.0.83 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 13 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure.
The brief summarizes the pattern across all 640 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/6054The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief