Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 607 decisions within 5 km, 6 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
2 no. data centre buildings on a site formerly occupied by Mitsui Denman. The proposed development provides for the construction of 2 no. data centre buildings as stand alone units (to be built in phases) including ancillary offices with associated structures including a substation building, waste compound, telecoms cabinet (PoP Cabinet) new access off the R623 to provide for independent access, car park, external generator & transformer areas to the west of the proposed data centre and all ancillary works. The proposal will modify part of permission granted under 16/5011, for a data centre development changing the permitted data centre building DC3 from 1 permitted building to 2 no. buildings and associated works. Extension of Duration to Permission granted under Planning Ref. No. 17/5895 & 22/6358.
2 no. data centre buildings on a site formerly occupied by Mitsui Denman. The proposed development provides for the construction of 2 no. data centre buildings as stand alone units (to be built in phases) including ancillary offices with associated structures including a substation building, waste compound, telecoms cabinet (PoP Cabinet) new access off the R623 to provide for independent access, car park, external generator & transformer areas to the west of the proposed data centre and all ancillary works. The proposal will modify part of permission granted under 16/5011, for a data centre development changing the permitted data centre building DC3 from 1 permitted building to 2 no. buildings and associated works.. Extension of Duration to Permission granted under Planning Ref. No. 17/5895
The installation of 8 No. external diesel back-up generators, including 1 No. vent stack per generator; the construction of a single-storey 10/20kV ESB substation; and all ancillary works, including an additional yard area, relocation of a permitted internal road, construction of a new internal road, and an extended 6m panel fence, to the west of each of the 2 No. data centre buildings (under construction) (4 No. diesel back-up generators per building), permitted under application register reference 17/5895, as extended under application register reference 22/06358.
Data centre development on a site formerly occupied by Mitsui Denman. The proposed development provides for the construction of 3 no. data centre buildings as one development or in phases. The proposal will modify an existing consent for 3 no. office buildings and access infrastructure at the site consented under 07/12475, as extended under 15/5450, so that one permitted office building is omitted and the permitted access off the R623 is also omitted in favour of a priority junction at the R623 with the permitted remaining offices accessed off the proposed internal access road. The proposed development also includes demolition of existing structures, ancillary services and site works, connections to permitted infrastructure, landscaping and associated boundary treatments, provision of ancillary structures including 3 no. security buildings, 3 no. waste compounds, a utility building, water tank and fencing, ground works with associated localised level changes and car parking.- Extension of duration of permission granted under planning reference: 16/5011.
(1) The demolition of the existing entrance canopy, (2) the construction of a new covered staff entrance with turnstiles and (3) alterations to the existing car park to construct a new HGV entrance with new barriers and associated ancillary works at their existing facility. The facility is subject to an Integrated Pollution Prevention and a Control License.
Janssen Pharmaceutical Sciences Unlimited Company intends to apply to Cork County Council for full planning permission for the construction of an extension to the existing staircore by adding an additional storey to facilitate a stairs from level 3 to roof level to provide safe roof access along with the construction of a plant support platform and screening on the existing roof of the Dryer Building at the existing facility at Wallingstown, Little Island, Co. Cork. The proposed development is for modifications to an establishment to which the Major Accidents Directive applies. The establishment is subject to an Integrated Pollution Prevention and a Control License and is regulated by the Environmental Protection Agency. Under the proposed development the site will remain in compliance with all regulatory requirements under existing license condition.
The brief summarizes the pattern across all 607 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/6358The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief