Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 280 decisions within 5 km, 6 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a single storey dwelling, garage, sewage treatment unit with percolation area, upgrade exisitng entrance and ancillary works.
Permission to construct extension to dwelling, wastewater treatment system and all associated site works.
Permission for retention for the relocation of the entrance to dwelling also permission to upgrade the existing septic tank to a waste water treatment plant and associated soil polishing filter and associated site works
(a) Construction of two storey nursing home to cater for 105 residents with single bedrooms, day rooms, dining areas, kitchen with ancillary services within a floor area of 4981sq/m, plant room 100.4sq/m associated to the nursing home, visitor and staff car parking, landscaped area, enclosed private courtyard, (b) Construction of staff accommodation consisting of 8 No 2 bed apartments, with associated parking and private open space, (c) Construction of 48 No 2-bedroom houses (Retirement Village) with landscaping visitor car parking, (a), (b) and (c) with entrance off the existing public road and connection to main foul sewer via on site foul sewage treatment/pump station with a connection to the public main water network.
To construct a) new front door with open porch to front of existing dwelling, b) replace existing front door with window, c) demolish existing single storey extension to rear of existing dwelling, d) construct single storey extension to rear and side of existing dwelling, e) decommission existing septic and install new septic tank with percolation area and ancillary works.
To construct dwelling which incorporates existing dwelling on site, septic tank and percolation area, farm building for the keeping of horses and site entrance.
The brief summarizes the pattern across all 280 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/6437The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief