Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 241 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
(1)The demolition of existing rear extension and front porch to existing dwelling house and the demolition of existing garage on site, (2) Construction of a new extension to existing dwelling house, (3) Decommissioning of existing septic tank and installation of new treatment unit and percolation area, (4) alterations to existing dwelling and provision for new vehicular entrance along with all ancillary site works.
Construct a new dwelling house, garage, entrance walls, wastewater treatment system with percolation area and associated site works
Construction of a new dwelling house and adjacent domestic garage and the installation of a new treatment unit and percolation area, along with all ancillary site works
Permission to construct a new dwelling house.
Permission to a) construct a new dwelling house, b) construct a new vehicular entrance, c) install a new bored well and d) install a new septic tank, percolation area and all associated site works.
Permission for two storey dwelling, domestic garage, sewerage system, site entrance and all associated works.
The brief summarizes the pattern across all 241 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22/6450The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief