Applications tied to the site
Partial coverage11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 146 decisions within 5 km, 11 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for a Community Playground including playground equipment, fence and gates, and all ancillary site works.
A) conversion of an existing mainstream classroom to a central activities space and associated alterations to elevations (b) construction of a special educational needs (SEN) base extension to the east of the existing facility consisting of 1 no. mainstream classrooms, 2 no. classroom safe bases, 2 no. small safe places, 1 no. toilet and shower area, 1 no. multi-sensory room, 1 no. staff toilets, 2 no. storage rooms, 1 no. linen room and an office along with play area and proposed yard extension at the existing school and all associated site works.
(a) Retention of existing pre-fabricated single storey classroom to the south of the existing facility, (b) Permission for construction of new classroom, new wheelchair w.c. for assisted users and new resource room to the north of the existing facility and (c) Construction of a new staff room and entrance to the east of the existing facility along with all associated site works
The construction of a split-level dwelling house, detached garage, waste water treatment system and all associated site works
Permission for: 1) construction of gym and 2) installation of 28 public lights, 4m high, along walkways around the perimeter of both playing pitches
(i) construction of ball wall and astro turf playing surface, along with flood lighting for the astro turf playing area (ii) associated site development works and (iii) retention of vehicular entrance (replacing agricultural entrance) and parking area.
The brief summarizes the pattern across all 146 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/6468The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief