Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 185 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a dwelling, garage, site entrance, and all associated site works including a waste water treatment system.
Planning permission for the construction of a dwelling, site entrance and all associated site works including a wastewater treatment system.
I.) Construction of a 656sq.m single storey and two storey extension for school use to rear of existing single storey school building ii.) The relocation, on a temporary basis, of 2 no. existing single storey modular buildings for school use from rear of existing school building to side of existing school building, iii) the construction of all associated site works including temporary construction access to west of existing school. Retention is sought, on a temporary basis, for the erection of a single storey modular building for school use to front of existing single storey school building together with all associated site works.
To construct a dwelling house, to install a domestic waste water treatment system and to carry out all associated site works.
Demolition of existing outbuilding and existing extensions to two storey farmhouse and for the construction of a new single storey extension to farmhouse, extension to existing remaining outbuilding and all associated site works
Retention of the roof lights to the existing dwellinghouse and the single storey extension to the side
The brief summarizes the pattern across all 185 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/6493The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief