Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 426 decisions within 5 km, 3 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
Construction of agricultural Mill building and canopy link to existing building, all associated site works
Construction of low emissions piggery building, 4 number feeding silos and all associated site works
Permission for alterations to an existing building unit consisting of the installation of photovoltaic panels on the existing roof structure, together with all associated site works.
Demolition of existing piggery buildings including part demolition of 1no. building and the construction of new piggery buildings consisting of fattener building, weaner/farrow building with covered links to existing piggery and existing office building and replacement of roof and internal alterations to existing office building, construction of feed tote unit and grain silos and construction of food test/research facility with covered link to adjacent gilt isolation building. Construction of additional car parking facilities, concrete yards and associated site works including gravel tracks and services and undertake all associated site works. Extension of Duration of Permission granted under Planning Reference: 13/4193
Permission for: a) Demolition of our existing single storey grasslands laboratory unit and adjoining agricultural buildings, b) Construction of a new two storey laboratory building with single storey office and storage facility, c) Construction of a new agricultural animal nutrition building, d) Construction of a new ESB substation, e) Undertake all associated ancillary accommodation and site works and construction of new carpark on our site.
The construction of a two storey office development (with pedestrian link bridge) extension to the side and rear of the Paddy O’Keeffe Innovation Centre and also undertake remodelling and expansion of the existing carpark and road network. All the above works to be inclusive of associated ancillary accommodation and site works.
The brief summarizes the pattern across all 426 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22/6512The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief