Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 205 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission to construct a dwelling house.
Permission to demolish straw storage shed and construct a straw bedded cattle shed with slatted tank and ancillary works.
1) The construction of a dwelling house, 2) the construction of a private on-site waste water treatment system and 3) all associated site works
The Applicant is seeking permission for the construction, operation and decommissioning of a wind energy development including: • 9 wind turbines each with a blade tip height of 175 metres, rotor diameter of 150 metres, hub height of 100 metres and a rated output of 4.5 megawatts. • Turbine Foundations, crane pad hardstanding areas and associated drainage. • Upgrade of existing site tracks and construction of new site tracks and associated drainage. • Access from the local road L5302 at Crought, Ballyclogh including a new site entrance for the construction phase and upgrading of an existing entrance for the operational phase. • An on-site 38 kilovolt electrical substation to Electricity Supply Board Networks specification to include control building with electrical infrastructure, welfare facilities supplied by rainwater harvesting and storage tank, a wastewater holding tank with high level alarm, car parking, security fencing and lighting, and all associated infrastructure, services, and site works including a temporary construction compound. • All associated underground electrical and communications cabling connecting the turbines to the proposed electrical substation. • A temporary site construction compound and associated ancillary infrastructure including welfare services, office accommodation, parking, fencing, lighting etc. • Areas for temporary storage of excavated materials. • A permanent meteorological mast of 100 metres height above ground level on a concrete base. • Installation of approximately 13.5 kilometres of 38 kilovolts underground electrical cabling, mainly within the public road, between the proposed wind farm substation to the boundary of Mallow 110 kilovolt substation at Saint Joseph’s Road Mallow. • All associated site works including site clearance and ancillary development including site drainage/Sustainable Drainage System, security gates, fencing, permanent and temporary signage, and biodiversity mitigation and enhancements, including hedgerow planting. The Applicant is seeking a 10-year duration planning permission and 35-year operational period from the date of overall commissioning of the entire wind farm. The Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.The wind farm development is proposed on a site in the townlands of Polnareagha and Ardskeagh (Templemary E.D.); and Tullacondra and Croughta, (Kilmaclenine E.D.), County Cork. The proposed grid connection will be installed underground mainly within the public road from the wind farm site at Croughta, Ballyclogh to the boundary of the 110 Kilovolts substation at Saint Joseph’s Road, Mallow passing through the townlands of Kilmaclenine, Croughta, Knockaunavaddreen, Copestown, (Kilmaclenine E.D.), Ballybeg (Buttevant E.D.), Baltydaniel East, Twopothouse, and Caurraghakerry (Caherduggan E.D); and Cloghlucas North, Curraghphadeen, Ballyviniter Upper, Ballyviniter Middle, Ballyviniter Lower, Parkadallane, Carrigoon More and Carrigoon Beg Mallow Rural E.D.).
Permission to a) construct a new dwelling house, b) construct a new vehicular entrance and c) install a new septic tank, percolation area and all associated site works
Permission to construct (i) loose shed (ii) slatted shed (iii) storage shed and all associated site works and Retention of slatted shed
The brief summarizes the pattern across all 205 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/6517The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief