Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 228 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of a) Demolition of existing dairy shed, straw bed lean-to shed and bull pen shed, b) Construction of an agricultural building to include a milking parlour, dairy & ancillary room, drafting area with handling facilities, livestock waiting yard and underground slatted storage tank, c) Construction of 2 no. silage pits, d) Erection of a meal bin and all associated site works.
Single-storey extension to front and side of dwelling, to be used as granny flat together with ancillary site works.
Alterations and single storey extension to rear of existing dwelling and all associated site development works
An amendment to the development permitted pursuant to Cork County Council Planning Register Reference 09/4399 to increase the operational duration of the existing wind turbine and all associated ancillary infrastructure from 20 years to 30 years from the date of full commissioning of the wind turbine.
To construct a new dwelling house.
Construct an extension to southern gable of dwelling house and construct a domestic garage with associated site works.
The brief summarizes the pattern across all 228 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/6550The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief