Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 131 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for retention of the following: 1) an existing bay extension on the southern gable, 2) an existing extension of the bathroom on the northern side, 3)an existing utility extension to the northern side, 4) alterations to a number of window and external door locations from those shown on the planning drawings submitted under 95/1719, 5) an existing domestic garage.
To construct a dwellinghouse
1. Permission to demolish the existing rear extension and to construct a new extension to the rear of the existing dwelling house, 2. Retention of the existing domestic garage as constructed, 3. Retention of the existing partially constructed storage shed and completion of same
To build a slatted cubicle house and lay hardcore for round bales
To construct a new dwelling house.
The construction of MV ESB substation adjoining potato stores and permission for retention of refrigerated potato store, potato stores, & stores for the storage of potato boxes, onion intake store & onion stores & plant rooms, greenhouse, farm stores for housing farm machinery & repair workshop, chemical store & compound for storage LPG gas over-ground tanks & ancillary works.
The brief summarizes the pattern across all 131 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/6802The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief