Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 534 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct an extension to the existing Whitegate Regional Water Treatment Plant. These works will include the construction of a single storey treatment building with solar PV roof panels, 9 no. above-ground tanks, 3 no. below-ground tanks, 1 no. ESB substation building, 1 no. control kiosk building, 1 no. attenuation pond, 1 no. generator and fuel storage tank, the realignment of the existing access from the public road with road markings and road signs, boundary fence and security gate, drainage network and all other site development works including existing container to be relocated.
A) The construction of a ground floor extension to the rear of the existing dwelling house, b) Retention of attic conversion to habitable space and rooflights to rear elevation, c) Construction of puraflo modules and percolation area to existing septic tank and all associated site works.
Construct a new dwelling house
The construction of a new detached dormer dwelling including a new waste water treatment unit and percolation area, a new site entrance, including all associated site works, and associated landscaping.
Permission for 1) a Change of plan to the planning application granted under planning Reference 186022; 2) The construction of new single storey detached dwelling with first floor mezzanine; 3) A new wastewater treatment unit and percolation area; and including all associated site works.
To construct a dwelling house, partially single storey and partially 2 storey, together with a shed/workshop for use incidental to the enjoyment of the dwelling house, on-site sewage treatment system, and all associated site development works.
The brief summarizes the pattern across all 534 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/6829The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief