Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 403 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of 96 no. dwelling houses, creche, local pumping station, new entrance from Church Street and all associated site development works. The proposed development consists of the construction of 7 no. 4-bed (8 person) detached houses, 14 no. 4-bed (7 person) semi-detached houses, 16 no. 3-bed (6 person) semi-detached houses, 8 no. 3-bed (5 person) semi-detached houses, 22 no. 3-bed (6 person) end of terrace houses, 12 no. 3-bed (5 person) end of terrace houses, 17 no. 2 bed mid terrace houses, creche for 52 children and 9 staff.
Permission for 1) the removal of the existing floodlight masts, 2) new synthetic all-weather playing pitch with perimeter fencing at 2.4m in height & 2 no. ball catching fences at 5.0m in height, 3) the installation of 6 number 12m flood light masts with LED floodlighting and 2 number five-meter-high hurling wall balls to service the new all-weather playing pitch, 4) new walkway to existing playing pitch and new perimeter fencing at 1.2m in height, 5) the installation of 6 number 20m flood light masts to the existing playing pitch, 6) the installation of a ESB generator to serve the new floodlights, 7)revised carparking layout, 8) all site development works
Permission for a) a change of use for the ground floor of the property from retail use to use as a veterinary clinic, b) a vehicular set down area to the front of the property, c) a single storey rear extension for use as a veterinary clinic (the extension being part of the proposed veterinary clinic mentioned in point a) above), d) signage to front elevation, e) all associated site works
Construction of a steel shed, for use as a workshop and meeting place for members of Cloyne Men’s Shed and all associated site works.
Alterations to provide toilet and tea station, provision of wall lights and 2 no. stone/timber seats to west elevation and new external stone paving at the west elevation entrance and all ancillary works. The proposed development consists of works to a protected structure.
To erect a single storey extension to the side of dwelling house.
The brief summarizes the pattern across all 403 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/6844The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief