Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 189 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To demolish an existing ruined dwellinghouse and construct a new dwellinghouse and a new waste water treatment system and all associated works
Permission for the following works to house / property: (i) Proposed balcony extension to house, (ii) alteration to roof, (iii) relocation of entrance to side of house, (iv) construction of sheltered open storage area to rear, (v) removal of porch and of unauthorized conservatory, (vi) fenestration changes to house, (vii) decommission / infill of external swimming pool, (viii) installation of replacement waste water system, (ix) retention of existing domestic garage and (x) all associated site works
To remove rock armour from a breakwater that rests on state foreshore and relocate the rock armour above the High Water Mark and all associated site works
Proposed renovations and extensions to an existing dwelling, the decommissioning of an existing septic tank and provision of a replacement wastewater treatment unit with percolation area, and all associated site works
Construction of 1. an office and gear changing rooms connected to 2. a gear drying storeroom with 3. a pergola type shelter porch, 4. boat house for storage of kayaks 5. a Kayak akd pedestrian access to Reen Pier and 6. a two vehicle turning bay from road above together with associated site development works
An extension and alterations to existing garage for use as a boat house
The brief summarizes the pattern across all 189 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/759The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief