Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 313 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A. Demolition of former ESB building (131m2 approx.), B. Demolition of existing single storey entrance/exit lobbies and office (71m2 approx., northern evelation of Drinagh Co-op Retail Warehouse), C. Construction of two storey retail warehouse extension (1345 m2 approx., northern elevation of Drinagh Co-op Retail Warehouse) and new single storey Feed Store building (648m2 approx., to the East of Drinagh Co-op Retail Warehouse), D. Alterations to existing Drinagh Co-op Retail Warehouse facades (northern and western elevations) to include demolition of pyramid roof and capping on existing tower, removal of cantilever louvres and amendments to material finishes, fenestration and signage, E. Extension of and upgrades to the public and private realm to include: i. Provision of new open storage yard to southeast to include pallet racking, set down areas and associated site works, ii. Extension of and improvements to car parking areas, and provision of new set down areas, motorcycle and bicycle parking, pedestrian footpaths, landscaping, and new internal road network, iii. Closure of 2 no. existing vehicular accesses along Market Street (to former ESB building and Drinagh Co-op Retail Warehouse) and construction of new vehicular entrance onto Market Street, provision of pedestrian connectivity, improved boundary treatments and realignment of public footpath on Market Street, iv. Extension of existing estate roadway to the south, realignment of and improvements to existing boundary to southeast (to comply with legal agreement between respective landowners), to facilitate construction of new heavy goods vehicular access from estate roadway to proposed open storage yard, and F. All ancillary site development works including external display area, internal security gate, gate cabin, bin store, bicycle shelters, trolley bays, public lighting and signage.
Amalgamation and change of use of the former Atlantic Boating Premises and the K&T Tyre Specialist Premises for use as a single retail warehousing outlet and associated signage, elevational changes, replacement of the mezzanine area for use as offices/staff facilities and all other ancillary site works including boundary works and alterations to the existing vehicular entrance to the site from the Baltimore Road Roundabout
Demolish existing dwelling house and domestic garage, replace same with a single storey dwelling house and detached domestic garage and all associated site works
Permission for installation of solar panel array (PV), on the roof of the existing Drinagh Supermarket
To construct single storey rear extension to dwelling and to convert attic to ancillary living accommodation
Reconfiguration of the existing Skibbereen Lidl Store car park by removing 15 no. car parking spaces and providing 4 no. electric vehicle (EV) charging spaces and 1 no. car parking space, the construction of a new car parking area on undeveloped lands to the northeast of the existing Skibbereen Lidl Store of 33 no. car parking spaces (including 16 no. electric vehicle (EV) designated spaces), accessed through the existing Skibbereen Lidl Store car park, the construction of a new dedicated pedestrian access from Townsend Street, the construction of drainage services associated with the proposed new car park connecting to the existing below ground attenuation tank which serves the overall current Lidl Store development, hard and soft landscaping to include a Pollinator Friendly' native wildflower meadow, and all other ancillary and associated site development works above and below ground level, all at this site of 0.67 ha located
The brief summarizes the pattern across all 313 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/156The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief