Applications tied to the site
Partial coverage19 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
19 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 515 decisions within 5 km, 19 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
19 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
19 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
1. Conversion of part of factory to office area on ground floor and placement of 1 new window on ground floor south elevation and 2 new windows and 1 external door on ground floor west elevation serving office conversion, 2. Construction of a new factory extension on north side of existing factory and all associated site/drainage/landscaping and ancillary works, 3. Moving existing car park serving factory and office to new location on site where hard standing already exists and forming a pedestrian steps and walk way from car park to lower factory yard area
Construction of a warehouse unit of 500 sq.m, with option for possible future subdivision to 2 no. warehouse units of 250sq.m each, and all ancillary site development works including parking, retaining wall, services and landscaping
Works at the former Orchard Warehousing Facility. The works include the demolition of the existing gate, pillars and fencing to be replaced by a blockwork splayed entrance and the demolition of 2 no. outbuildings [113.65m2] as well as the construction of a two storey extension to the front of 'warehouse 2' to form a new office and reception area with ancillary staff and meeting facilities and the change of use of warehouse 3 from warehouse storage to workshop involving the fitting out of containers to form housing units and a proposed raised platform to warehouse 3, the provision of two no. storage containers on site as well as all associated site development works.
To erect a dormer type dwelling house, an on-site sewage treatment system and all associated site development works.
To erect a dormer type dwellinghouse, an on-site sewage treatment system and all associated site development works. This is a change of plan from permission Reg. No. 12/5088, which was subsequently extended under Permission Reg. No. 17/4754.
Permission for the construction of a dormer type house, an onsite sewage treatment system, vehicle entrance and all associated site works
The brief summarizes the pattern across all 515 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 23/4010The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief