Applications tied to the site
Partial coverage16 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
16 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 343 decisions within 5 km, 16 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
16 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
16 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The installation of a modular substation and ancillary site development works: to facilitate 2 no. shared electric vehicle charging units and 4 no. charging bays within a partially reconfigured parking area.
The construction of an 18-metre-high free-standing communications structure (total height with antennas 18.1m) with its associated antennae, communication dishes, ground equipment and all associated site development works. The development will form part of Eircom Ltd existing telecommunications and broadband network.
The demolition of existing commercial unit and construction of new 16 unit housing development consisting of 6 number 3 bed semi-detached dwellinghouses, 4 number 3 bed townhouses, 2 number 2 bed semi-detached dwellinghouses and 4 number 2 bed townhouses, entrance and estate driveway, storm and surface water sewers including attenuation system, public lighting, boundary walls, footpath together with all other ancillary site works.
Permission for the removal of existing temporary office space for Jons Civil Engineering Company Limited, along with the construction of 9 number commercial units under ‘Class 4 and Class 5’ in the current Planning and Development Regulations – Classes of use, consisting of: warehouse\office building incorporating warehouse space, canteen\kitchenette area, W.C’s, administration and offices together with all ancillary site works including public lighting, car parking and attenuation system.
Construction of new entrance lobby to existing office building, construction to detached storage shed ancillary to office building and all associated site works.
Retain domestic garage and all associated site works
The brief summarizes the pattern across all 343 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/4045The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief